Skip to main content
Red & White Group
Former workshop interior before cleaning and redecoration

Service

Factory closure and relocation support

Factory closure and relocation support covers the practical site work around a shutdown or move: phased clearance, coordination of asset and plant removal, cleaning, reinstatement and preparing the building for handover. Red & White Group coordinates these workstreams as one team so a manufacturing or logistics site moves from live operation to agreed final condition against a fixed date.

Who this service is for

  • Manufacturers closing or consolidating a plant
  • Operations and site directors managing a relocation
  • Group property teams handing a building back
  • Facilities managers running a phased shutdown

Problems and trigger events

  • A production line is being decommissioned or moved
  • A site closure has a board-agreed completion date
  • A landlord handover follows the final production day
  • Equipment is being sold, relocated or scrapped

Scope

Typical scope of work

  • Phased clearance around continuing production areas
  • Coordination with your plant movers, equipment buyers and specialists
  • Removal of redundant fittings, racking, partitions and site infrastructure
  • Deep and high-level cleaning of production areas, steelwork and cladding
  • Reinstatement, decoration and preparation for inspection and handover

Quoting

What we need to prepare a quotation

  • Site address, floor area and building type
  • The closure or relocation programme and key dates
  • Which areas remain live and for how long
  • What plant is leaving, and who is removing it
  • Any known contamination, residues or specialist requirements

Safety

Safety and compliance

  • Permit-to-work discipline where production continues alongside clearance
  • Isolation of services confirmed with your engineering team before any removal
  • Specialist lifting, asbestos and hazardous-material work is not assumed in scope; where required it is assessed and confirmed with the appropriate competent party

Process

How the work is delivered

  1. Step 1

    Understand the programme

    We map the closure dates, live areas and the final condition required.

  2. Step 2

    Survey and define the scope

    We survey each area, confirm what is in scope and identify anything needing specialist competence.

  3. Step 3

    Plan sequencing, safety and access

    Phasing is agreed so clearance follows production down the site without interrupting what is still running.

  4. Step 4

    Coordinate and deliver

    One point of contact coordinates our teams alongside your movers and equipment specialists.

  5. Step 5

    Review, document and prepare for handover

    Areas are signed off progressively with photographic records ready for landlord or purchaser inspection.

Coverage

Where we deliver this work

Based in Burton-on-Trent, working across the Midlands, and available for suitable projects nationwide. Availability is project-dependent and confirmed after survey.

Bee Sweet Occasions showroom wall after full-height white painting
After: full-height white painting to bare blockwork and cleaned high-level steelwork.
Operative carrying out high-level cleaning inside a commercial unit
High-level cleaning to wall cladding and steelwork, completed before any decoration started.
Mobile access tower used during high-level preparation work
Mobile access tower and floor protection set up for safe working at height during preparation.
Internal wall cladding after degreasing and cleaning
After: the same cladding degreased and cleaned back to its original finish.

Questions

Factory closure and relocation: common questions

Working towards a lease-end, closure or relocation deadline?

Tell us about the site, the required outcome and the date you are working towards. We will review the scope and arrange the right next step.

EmailRequest a quote