Skip to main content
Red & White Group
Bee Sweet Occasions unit after external cladding refurbishment in Burton-on-Trent

Project — Wetmore Road, Burton-on-Trent

Bee Sweet Occasions: a former workshop turned showroom

Red & White Group cleaned, prepared and redecorated a former workshop on Wetmore Road in Burton-on-Trent so Bee Sweet Occasions could use it as a showroom for wedding and event dressing displays. The work covered high-level steelwork cleaning, cladding degreasing, full-height painting to bare blockwork and specialist external coatings.

Project facts

Project details

Sector
Commercial unit refurbishment
Client
Bee Sweet Occasions
Location
Wetmore Road, Burton-on-Trent
Building type
Former workshop unit
End use
Wedding and event dressing showroom

The situation

The unit was a former workshop affected by years of dust and neglect. Internally, bare blockwork and high-level steelwork carried heavy soiling; externally, the cladding, gutters and flashings had degraded.

The brief and deadline

Deliver a quick, coordinated renovation that turned the space into a presentable showroom for wedding and event dressing displays, inside and out.

Constraints

  • Extensive high-level cleaning required before any decoration could start
  • Heavily soiled surfaces needing degreasing and preparation rather than simple overpainting
  • External coatings requiring correct preparation and specialist products

Delivery

Scope delivered

  • High-level steelwork cleaning
  • High-level wall-cladding degreasing and cleaning
  • Full-height white painting to bare blockwork
  • External gutters and flashings cleaned, prepared and finished with two coats of specialist matt black paint
  • External cladding cleaned, degreased, prepared and finished with three coats of specialist white PU Plastisol paint

How the work was coordinated

One team sequenced the work so that high-level cleaning finished before decoration began, and external preparation and coating followed as access allowed — keeping the renovation on a short programme.

High-level cleaning to wall cladding and steelwork, completed before any decoration started.
Mobile access tower and floor protection set up for safe working at height during preparation.

Evidence

Before and after

Drag each slider to reveal the finished work.

Exterior elevation

Bee Sweet Occasions unit after external cladding refurbishment in Burton-on-TrentCommercial workshop unit before external refurbishment in Burton-on-TrentBeforeAfter
After: cladding cleaned, degreased and finished in three coats of specialist white PU Plastisol paint, with gutters and flashings in matt black.

Interior wall

Bee Sweet Occasions showroom wall after full-height white paintingFormer workshop interior before cleaning and redecorationBeforeAfter
After: full-height white painting to bare blockwork and cleaned high-level steelwork.

Internal wall cladding

Internal wall cladding after degreasing and cleaningSoiled internal wall cladding before specialist cleaningBeforeAfter
After: the same cladding degreased and cleaned back to its original finish.

Outcome

The result

A clean, bright interior with full-height white walls and cleaned high-level steelwork, and an exterior finished in specialist white cladding coating with matt black gutters and flashings — a workshop presenting as a showroom.

Last reviewed:

Planning a similar project?

Tell us about the site, the condition it is in and the outcome you need. We will review the scope and arrange a survey.

EmailRequest a quote